  • Step-by-Step Process of Drilled Shaft Construction in Cohesive and Caving Soils
    ❤ Add to collection
  • Step-by-Step Process of Drilled Shaft Construction in Cohesive and Caving Soils

    This image illustrates the process of drilled shaft construction in both cohesive and caving soils. It demonstrates the use of drilling slurry to

     support the excavation, the insertion of reinforcing steel, and concrete placement. This method ensures stability during drilling and proper 

    load transfer for deep foundation applications, especially in challenging soil conditions.


    • ¥0.00
      ¥0.00
      ¥0.00
      ¥0.00
    • Satisfaction:

      Sales: 0

      Review: 0

    Weight:0.000KG
    • Quantity:
Description

This image illustrates the process of drilled shaft construction in both cohesive and caving soils. It demonstrates the use of drilling slurry to

 support the excavation, the insertion of reinforcing steel, and concrete placement. This method ensures stability during drilling and proper 

load transfer for deep foundation applications, especially in challenging soil conditions.