This diagram showcases the fully cased drilling process using a rotary drive. It begins with casing installation, followed by drilling with a
bucket or auger to stabilize the borehole wall using segmented casings. Reinforcement cages are then installed, and concrete is
poured through a tremie pipe. Finally, the casings are extracted using the rotary drive during the concreting process. This method
ensures borehole stability and is widely used in foundation and piling projects for its efficiency and precision.