This illustrates the key components of an oil drilling rig. The Crown Block is located at the top and supports heavy loads. The
Derrick is the tower structure, while the Monkey Board provides a platform for workers to handle the pipe. The Traveling Block moves
vertically, lifting and lowering the pipe, which is guided through the Drill Floor. These components are essential for the safe and
efficient drilling of oil wells, ensuring proper handling and control during drilling operations
Tel:0086-18684963907
WhatsApp:0086-18684963907
Email:ceo@hnironrubikcubemachine.com
Wechat: 0086-18684963907
Factory Address:Room 2301, Building 12, Phase I, China Resources Land, No. 266, East Sixth Road, Xingsha Street, Changsha County, Hunan Province