< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2054324395091430&ev=PageView&noscript=1" />
 
0086-18684963907
ceo@hnironrubikcubemachine.com
How Can You Prevent Profit Loss in Drilling Rig Project Quotes? | hnironrubikcubemachine.com
Source: | Author:selina | Published time: 2025-09-26 | 13 Views | Share:

How Can You Prevent Profit Loss in Drilling Rig Project Quotes? | hnironrubikcubemachine.com

Using a SANY used rotary drilling rig or XCMG used rotary drilling rig? Ensure your quote includes these 8 cost items. This is especially critical for Second-hand rotary drilling rig or Reconditioned rotary drilling rig jobs.

1. Access Route Modifications

Some jobs require gravel pads, crane mats, or grading—particularly for XCMG used rotary drilling rig access in rural areas.

2. Temporary Utilities

Water, power, and lighting are often needed onsite for extended SANY used rotary drilling rig operations.

3. Service Vehicles

Support trucks, tool vans, and fuel trailers must be costed in for Reconditioned rotary drilling rig deployment.

4. Safety Signage & PPE

Warning signs, cones, fencing, and personal protective equipment are required for every Second-hand rotary drilling rig crew.

5. Waste Handling

Cuttings, water runoff, and used oil must be handled per law—missed cost here can mean penalties.

6. Fuel Delivery Delays

Urban or remote jobs using a SANY used rotary drilling rig may suffer from logistics lag. Factor in buffer fuel supply.

7. Equipment Insurance

Used equipment like a XCMG used rotary drilling rig may require special policy riders.

8. Project Management Time

Overhead for daily reporting, subcontractor coordination, and schedule tracking is critical cost.

Missing these costs in your quote can drain your margin—especially on Reconditioned rotary drilling rig projects. hnironrubikcubemachine.com

READ MORE: