< img height="1" width="1" style="display:none" src="https://www.facebook.com/tr?id=2054324395091430&ev=PageView&noscript=1" />
 
0086-18684963907
ceo@hnironrubikcubemachine.com
What Expenses Are Often Missed in Drilling Project Quotes? | hnironrubikcubemachine.com
Source: | Author:selina | Published time: 2025-09-26 | 11 Views | Share:

What Expenses Are Often Missed in Drilling Project Quotes? | hnironrubikcubemachine.com

Working with a SANY used rotary drilling rig or XCMG used rotary drilling rig? Quoting a Second-hand rotary drilling rig project? Don't overlook these 8 essential cost items—they determine your margin and competitiveness.

1. Inspection & Testing Fees

Soil testing, rig load verification, noise emission reports—these apply to many Reconditioned rotary drilling rig operations.

2. Weather Delays

Rain or freezing temps mean standby time. Add a weather contingency to your quote.

3. Security & Lighting

Urban sites may require fencing, guard services, and lighting to secure your SANY used rotary drilling rig.

4. Utilities & Obstruction Removal

Tree clearing, pipe rerouting, or power line relocation are often needed for XCMG used rotary drilling rig access.

5. Insurance Premiums

Coverage for tools, rig transport, crew liability—costs vary by region and must be included.

6. Productivity Loss

Time lost due to minor breakdowns or rework is common with Second-hand rotary drilling rig jobs.

7. Training Time

New operators may require instruction, especially when shifting to a Reconditioned rotary drilling rig.

8. End-of-Job Audit

Site review, as-built documentation, and client sign-off may take 1–2 extra days.

Include these in your SANY used rotary drilling rig or XCMG used rotary drilling rig quote to stay profitable. hnironrubikcubemachine.com

READ MORE: